Here is the new facility for North American Construction Group in Acheson, Alberta. The structural building envelope is over 90,000sq.ft and took only 6 weeks to install. It is constructed from 314 load-bearing/insulated precast panels, hollow-core floors and a steel roof system. The total amount of precast concrete used exceeds 5.5 million pounds.