13,594 SQ FT

86 Insulated Precast Panels

4 Months Construction

2.34 Million Pounds of Concrete

Pipeline Machinery

Acheson, Alberta
Design-Build Contractor

Operating worldwide, PipeLine Machinery services and rents out CAT equipment for pipeline work. With their head office located in Texas, this Alberta based location was built to be used as a base for equipment to return to. Eagle was awarded this contract after offering cost-effective changes and speed solutions. Once construction commenced, a construction challenge that arose was the ground soil on site. This was overcome by working closely with and maintaining open communication with the geotechnical engineer. This building was designed with an underground floor exhaust to hook up equipment vehicles which removes the fumes from their work environment. Another feature integrated into this building is a trench flush/greywater reuse cistern. This project was completed on time and on budget.

From breaking ground until occupancy, this project took only 4 months to build.

” We never encountered any pricing issues, the price quoted was the price we paid.  The quality of all of the sub-contractors was excellent, we could tell that Eagle had a good network of sub-trades that they used on many projects in the past. “