12,200 SQ.FT

120 Insulated Precast Panels

5 Days precast installation

5 Days precast production

1.54 Million pounds of concrete

30 Foot tall panels

Red Deer Fire Hall #3

Red Deer, Alberta
Structural Contractor

In 2017. Eagle Builders was awarded the engineering, manufacturing and installation of the precast concrete structure for Firehall #3 in Red Deer, Alberta. The wall panels were designed to combine the structural, insulating and architectural elements into one building component.

Because the walls do not require perimeter columns, it allowed for more usable space inside the building. This structure followed many similarities to Firehall #4 including the architectural finish, precast manufacturing and installation times.


“With the longevity of precast concrete, this structure will be able to serve the community for many generations”